View Single Post
Old 03-10-2007, 03:07 PM   #8
ViperASR
Regular User
 
Join Date: Apr 2004
Location: Florida
Posts: 2,120
Default

First one took 1,5 hours, the next, a half. Can't wait to do the fronts.
Isnt it awesome the feeling you accomplishing something on your car , even if it is just something like changing brake rotors/pads. God, if I had a dollar for everytime ive had the discs off on the Porsche....

I just did the front ball-joints on the Porsche (because of the lowered front end had to get longer ball-joints to flatten on the control arms and steering arms), and it was funny like you said, the first one takes a long ass time, then the 2nd one goes relativly quickly.
__________________

"plus being able call your penis master chief during sex has got to be comical at least once"-gis
ViperASR is offline   Reply With Quote